<span id="ah8fi"><optgroup id="ah8fi"></optgroup></span>
<label id="ah8fi"></label>
    <label id="ah8fi"></label>
      <label id="ah8fi"></label>
      <rt id="ah8fi"></rt>

      Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

      News



      Tel:(0755)27151698
      Fax:(0755)27150611
      Mailbox:szzyzcl@163.com / szzy@szzy99.com
      Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
      Industry information

      當前位置:

      首頁 News Industry information

      Preparation before injection molding

      Release time:2024-01-24

      Injection molding production is the last step of molding injection molded parts. Before injection molding processing and production, we need to do a lot of preparatory work to ensure that injection molding processing and production are foolproof.


      1、 Preparation of plastic materials

      1. Confirm the number / type of plastic materials according to the requirements of product drawings;

      2. If you need to use color masterbatch or toner, you need to confirm the number and mixing proportion of Color Masterbatch or toner;

      3. Reconfirm whether the materials in the barrel are correct;

      4. Determine the drying temperature and time of plastic materials according to the material properties and product requirements.


      2、 Plastic mold preparation

      1. Confirm the number of plastic injection mold;

      2. Check whether the plastic injection mold has special structures such as inserts and core pulling;

      3. Check whether the positioning ring, hot runner interface and the appearance of the plastic injection mold are OK;

      4. Check the diameter and length of water pipe, the length of pressing plate, pressing plate bolt, suspension bridge and other plastic injection mold accessories;

      5. Check whether the mold pump nozzle matches the machine nozzle.

      3.jpg


      3、 Preparation of injection molding machine workbench

      1. Confirm whether the plastic injection mold can be correctly installed on the injection molding machine, including the maximum mold locking force of the machine, mold size, mold thickness, core pulling function, air blowing device, etc;

      2. Whether the ejector rod and injection mold of the injection molding machine are suitable;

      3. Check whether the injection screw is cleaned before injection;

      4. Check whether the mold temperature machine, manipulator, automatic mixer and automatic suction machine can work normally: whether the fixture of the manipulator matches the mold;

      5. Confirm the drawings / samples of injection molding products and understand the important dimensions;

      6. Preparation of other relevant tools.

      Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
      主站蜘蛛池模板: 亚洲狠狠久久综合一区77777| 天天综合天天做天天综合| 一本色综合网久久| 国产亚洲精品精品国产亚洲综合| 久久综合久久鬼色| 色88久久久久高潮综合影院| 伊人情人综合成人久久网小说| 狠狠色狠狠色综合日日不卡 | 久久综合九色欧美综合狠狠 | 丁香婷婷综合网| 久久久久亚洲av综合波多野结衣| 婷婷五月综合色视频| 狠狠色狠狠色综合久久| 色欲综合久久中文字幕网| 天天综合色天天综合色hd| 色欲天天婬色婬香视频综合网| 色综合久久久久综合体桃花网 | 欧美国产日韩综合在线| 亚洲欧美国产日韩综合久久| 91成人亚洲综合欧美日韩| 国产精品综合色区在线观看| 亚洲AV成人潮喷综合网| 婷婷久久综合| 国产综合一区二区| 亚洲国产精品综合久久一线| 色视频综合无码一区二区三区| 亚洲国产综合人成综合网站| 色综合欧美在线视频区| 一本一道久久a久久精品综合| 亚洲欧美综合中文| 青青综合在线| 亚洲国产成人五月综合网| 国产成人精品综合在线观看| 插插插色欲综合网| 亚洲综合伊人久久大杳蕉| 自拍三级综合影视| 久久久久高潮综合影院| 狠狠色噜噜狠狠狠狠色综合久AV| 精品国产综合成人亚洲区| 久久狠狠色狠狠色综合| 国产成人综合日韩精品无码不卡|